46 Wright’s Landing
![](/wp-content/uploads/Portfolio.jpg)
Auburn, ME
46 Wright’s Landing
Project Details
Role
Preconstruction / Construction Manager
Client
Giles Property Management, LLC
Architect
TC Architectural
Size
18,000 sq ft
Duration
33 Months
![](https://penobscotgc.com/wp-content/uploads/wrights-landing.jpg)
This project represents a groundbreaking achievement as the first in Maine to utilize tilt-up construction exterior “sandwich” panels. These innovative panels, featuring rigid insulation sandwiched between two concrete slabs with integrated façade elements, weigh up to 60,000 pounds and were installed with precision and close coordination with trades.
The 25,000-square-foot, two-story facility includes Class A office space, storage, and warehouse areas. PGC led an accelerated pre-development and design schedule, coordinated the assembly of the tilt-up panels, and managed tenant fit-out packages, delivering a cutting-edge project that sets a new benchmark for Maine construction.